Schedule
Managers onlyChange how long a job takes
Drag the top or bottom edge of a job on the schedule to make it longer or shorter.
Steps
- Open Schedule and choose Day.
- Move your pointer to the very top or very bottom edge of the job. The pointer changes to an up-and-down arrow.
- Drag the bottom edge to change when the job finishes. The start time stays put.
- Drag the top edge to change when the job starts. The finish time stays put.
- Let go to save.
Good to know
- The edge you drag snaps to the nearest quarter hour, and dragging can't make a job shorter than 15 minutes.
- Press Esc while dragging to cancel.
- Resizing never moves the job to another column, even if your pointer drifts sideways.
- A job that runs past midnight is cut off at the bottom of the day and can't be resized from the bottom. Open the job and change its duration instead.
- You can also type the length into Est. duration (min) when you edit the job.
- Only managers can resize jobs.
